Home Remodel Project
December 2007 - Spring 2008
May 2008 - We're done!
Here are some final pictures of the house. We still haven't finished decorating and
we are getting some new furniture, but for the most part the house is done! It was
a long winter, but we are definitely enjoying being finished this spring. We love it!
You are also more than welcome to drop by if you want a peek. We love company!
Final Pictures - May 2008
April 20, 2008 - Pretty much done!
We're not completely finished putting the house back together, but I thought I'd show
some pictures of the house. There are just a few more odds and ends to take care of and
of course, we have a ton of stuff to organize. However, most of it is now clean so that
feels good.
Pictures - Sunday, Apr 20
April 9, 2008 - Almost done!
These pictures basically show from March 22 up until the end. I think the only thing not
shown is the carpet installation which took place on April 10th and April 16th. I may come back
and fill in those pictures, but wanted to get these put up for now.
Pictures - Wednesday, Apr 9
March 22, 2008 - Day 55+ (Saturday)
After a couple days of no activity, things are starting to pick up again. They installed
the door to our screened in porch. It is so nice. It lets a lot of light in and just
it just feels good to not have it blocked off anymore. They also started
priming the walls. They will finish that on Monday. The big news is that the
siding is finished! Yeah! It looks really good. I was nervous about it matching, but
I think it looks great. They found our exact siding, so the only difference is the
fading aspect, but you can't really notice it.
Pictures - Saturday, Mar 22
March 17, 2008 - Day 51
It doesn't seem like much has happened recently. We are pretty sure that
they won't be done by March 31st, but we don't have a new date yet. We were
originally told that the drywall stuff would be done maybe by Wed of this week. Then
there is all the painting, trim and staining that needs to be done. The fireplace
needs to be started up (which will happen Wed after it is cleaned) and then the tile
needs to be installed. The cabinets also need to be installed. We need to have our
patio door installed and the cedar in the screened in porch done. Also the remaining part
of the deck, the railings to the deck and the E-Z screen windows need to be put in.
Plus there is the siding. Hmmmm, what else? Oh and the carpet. It seems like a lot. I guess
I would say that I hope they are done before we go to trivia. Last week they did
the drywall on two of the nicest days. We just stayed away from the house as much as
we could and fortunately we were able to play outside. On Wednesday, the concrete floor
was poured. The guy told us we could write in it if we wanted, so we did - even
though it will be covered by the flooring. I don't have a lot of specific pictures
of the drywall process, but you can see it in some of them.
Pictures - Monday, Mar 17
March 10, 2008 - Day 46
A lot happened today. We headed out of the house to go swimming as fast as we could. Then
after Emily's nap we went outside to the park for an hour and then over to Jill's. It was
a day to get the kids out of the house! The sheetrock guys were there right away. Boy the
house looks different now. It's also dusty! The electricians were here working on finishing some
things up (although they are not done). They worked on rewiring our microwave today too. The heating
guys also stopped by later in the afternoon. It was busy outside. Mike and Mark worked on one part
of the roof that needed to be fixed. Then there were others installing the fascia? and prepping
the house for siding. Tim the cabinet guy stopped by to measure. Carol was here as well. They had
to work out a couple of electrical issues with the built in's. It's all working out though.
The house looks great. I'm guessing it's going to get worse though! We need to figure out what
we are going to do tomorrow to get out of the house as it's spring break and Adam and Emily
don't have school!
Pictures - Monday, Mar 10
March 7, 2008 - Day 45
It was kind of a day to wrap up. They will be sheetrocking on Monday. Mike and Mark finished
the soffits in the basement. Everything else is ready. The sheetrock was delivered at the
end of the day.
Pictures - Friday, Mar 7
March 6, 2008 - Day 44
A lot of work done this week. All the windows are now in, including the sliding door in the
basement. They've also demolished our old master bedroom closet. The new window
in there looks great. We love it. Today they took down Emily's closet and built the
half wall. We are having the wall instead of a railing becuase there was a water pipe
going up through that area that couldn't be moved. It will be hidden in one of the posts.
They also took out our fireplace and framed the new one. However our fireplace won't be hooked
back up until Monday so it's a little cold in here again. The insulation helps, but we still
get the chills in the evening. They will clean up more tomorrow as well as build a wall in the
basement and do some soffits. The sheetrockers come on Monday!
Pictures - Monday, Mar 3 thru Thursday, Mar 6
February 29, 2008 - Day 40
A lot has gone on since I last posted. It's harder and harder to keep up! I don't even
know that I can remember the order of when everything happened, so I'll just
fill in where we are now. Emily's room is becoming a loft. They broke through the
wall and we now have a nice stairway. We've moved Emily's crib to Adam's room and
she is napping there and sleeping there at night (Adam is in our bed). It's working so far.
Just today they started the demolition of her closet. Our master bedroom finally had the
wall broken through. There was an issue with a beam and a load bearing post so we've
had to make some changes. The stairs now come quite a bit into our room and we have a half wall
for the railing. We had to move them over some more so to use that space we are putting
a little storage closet with some shelves. It's nice because we are losing our
linen closet because of the loft so now we will get that storage back. The electrician
has been here all of this week so we have made lots of decisions about where lights
and switches and outlets go. The heating guys are also here working hard right now. Today
they were working on getting heat to the new addition off the back of the house.
The insulation guys were also here today. It's still a little cool as the windows
are not in, only covered, but you can tell the difference. Let's see, what else? The
security system people also stopped by to start working on installing the new system.
We've also made some decisions about the built in bookshelves and fireplace. I've put
in a picture of the tile we're going to use. We were able to go see it on a fireplace
at a home in the Parade of Homes. It was nice to actually see it instead of just
looking at a sample tile. We are also considering different paint colors that we saw at
some of the homes. Monday will be quieter as I think only the heating people will be here,
but Tuesday it will get busy again. We believe that we will start having
the walls sheetrocked next week. Yeah!
Pictures - Friday, Feb 22 thru Friday, Feb 29
February 21, 2008 - Day 34
It was a busy day here! I don't think I'll go back and individually update each day. I'll just
fill in on what has been happening this last week. At the end of last week they started putting
down the deck - at least the part where the screened in porch will be. They had to get that
put up because of finishing the roof. On Saturday Jeff crawled up and looked around a little.
This week they've been busy finishing the framing of the screened in porch as well as doing some
work on the interior of the second level. Tuesday they took off - we're assuming because of the frigid
temperatures! It has been cold. Yesterday the new furnace and water heater were installed and they
continued to work today. A lot of up and down through the house. They worked in our front door closet
and in Emily's room as well as the storage room downstairs. We were also told to start clearing out the
rooms as they were going to break through this afternoon. Emily had to take her nap in the guest room in the
basement. Unfortunately she only slept for an hour. I hope she can get used to it as she'll be sleeping
down there for naps until they are finished. They began breaking through in Emily's room. They
have to double check some structural stuff before breaking through in our room. I do have a lot of
before and after pictures of the two rooms. We didn't have to empty them completely, just make
room for them to work. Emily's room got pretty cold (they shut her door), but the put up some
insulation so she can sleep in there tonight. It's already warming up. They did come and talk to me first
too and let me take some pictures of the landing before they closed it up.
Pictures - Thursday, Feb 21
I am behind on updates, but here are some recent pictures...
Pictures - Wednesday, Feb 20
Pictures - Monday, Feb 18
Pictures - Saturday, Feb 16
Pictures - Friday, Feb 15
February 14, 2008 - Day 29
When we got home from preschool today, Mike came and told us that they have to remove
our dining room patio door in order to put the flooring in and build the screened
in porch. So we played upstairs for a while as they took it out and then put up some wood
and insulation to cover the space. I'm not sure how long we'll be without it. We now can't see
what is going on out there as well. Fortunately we can see from our master bedroom so I
got some pictures of them putting the screen down for under the room and actually
putting the decking down. Exciting!
Pictures - Thursday, Feb 14
February 13, 2008 - Day 28
Today we had a busy morning. The heating and cooling guys were here this morning, so
Mike and Mark broke through the wall in the closet on the main level and in the closet
in Emily's room. I'm not sure what else happened, but we now have 2 holes in the wall.
Later in the day Mark asked if we had seen the upstairs yet (which we hadn't since it
involves climbing a ladder on the outside of the house) so he took my camera and took
some pictures of the framing that was done. Later in the afternoon they worked on the
roof of the sunroom.
Pictures - Wednesday, Feb 13
February 12, 2008 - Day 27
Yesterday and today they continued framing upstairs. We found out that they
have all the interior walls done so when they break through from the house we
will be able to walk through there and see them. Demolition is scheduled to start
tomorrow, but I'm not sure how much they'll actually be doing. We will meet with Chip
in the morning to find out more of the schedule. These last two days have definitely
been loud. They have been working on the roof above Emily and our room's. Emily was able
to nap yesterday, but today she woke up with one of the bangs. She only got an hour and
boy, was she crabby. It will be an early bedtime tonight. The pictures were taken at three
times during the day. The first three were from before Adam went to preschool. Then the majority
were taken when we came back around noon. The last ones with the really blue sky
were taken when I walked the kids over to Kelley's before my piano lessons. They were
just finishing up for the day.
Pictures - Tuesday, Feb 12
February 10, 2008
We are back from our week in Bismarck. We left Friday, Feb 1 and returned today. Our neighbor
Jill told us on Wednesday that there were walls on our second story and did take a picture
for us, so I'll go back and post that when I get it. These are pictures we took when we
got home. There are also pictures of the inside of the house. Looks like we had a little water damage.
We can't really see what is happening inside the walls, but we should pretty soon. Demolition is
starting on the inside on Wednesday. Andy emailed on Friday and said they were right on schedule.
Also, at the end of the outdoor pictures I added a picture of the house being built across the street.
Pictures - Sunday, Feb 10
Pictures - Thursday, Jan 31
January 30, 2008 - Day 18
No work on the house today. It was -15 this morning and I think it only got up to -1.
Mike and Chip both stopped by though. They will be working inside tomorrow so we had to
clean out the front closet.
January 29, 2008 - Day 17
It was cold today! The guys working on the house across the street stopped early. Our guys
said it wasn't as bad because they were blocked from the wind by the house. Only a couple pictures
because we weren't outside much.
Pictures - Tuesday, Jan 29
January 28, 2008 - Day 16
They started demolition on the roof today. The tempurature was 40 degrees.
Pictures - Monday, Jan 28
January 27, 2008
It was a nice day out today (above 30), so we headed outside to check out the house.
Pictures - Sunday, Jan 27
January 25, 2008 - Day 15
The electrical demolition was today. They took out the lights in our living room so we
will have to use lamps for a while. They also put a new box in the basement. Our current
one was in the garage. Mike and Mark continued by framing the deck today. It's fun to actually
see it take form.
Pictures - Friday, Jan 25
January 24, 2008 - Day 14
Today they continued framing the sunroom. They also began framing the deck. In the middle of
all that the insulation guys came and removed the insulation above the living room. They basically
cut a hole in the roof and crawled in there and sucked it out. There are pictures, of course,
as well as some video. I was trying to get the noise on the video, but it didn't work too well. It really
wasn't that loud. The banging around was what we heard the most
Pictures - Thursday, Jan 24
Removing insulation
Adam watching the removal of insulation
January 23, 2008 - Day 13
It was cold again today. They started framing the sunroom (2nd level of addition off of the living
room). They also did some work on the roof. Tomorrow the insulation is coming out with
demolition of the roof starting on Monday. We're glad it's warming up, but we'll definitely be
using our fireplace a lot. I know there are a lot of pictures and I don't know that I'll be documenting
every little step of the way, but this has been the fun part to watch. Jeff also doesn't
get to see what goes on during the day so I like to give him something to look at!
Pictures - Wednesday, Jan 23
January 22, 2008 - Day 12
Another busy day. They continued framing the basement addition. The walls are up as well as
a roof. They also drilled some holes for the deck posts and I believe poured some cement.
At least I saw a truck arrive as I was leaving and it was gone when I got back. We had met Mike
yesterday, but today introduced ourselves to Mark. Adam was asking what his name was and when
I said I didn't know told me that he thought we should just call him Chip. So I leaned out the window
and found out his real name. :) It was cold again today. High around 10. In a couple
of days it should be warming up though.
Pictures - Tuesday, Jan 22
January 21, 2008 - Day 11
Busy day today. They started framing the basement. It was cold too! I think the high was around 9 degrees.
Pictures - Monday, Jan 21
January 18, 2008 - Day 10
Not much today. Chip just came and covered the ground where the deck posts go.
Pictures - Friday, Jan 18
January 16, 2008 - Day 8
It's been a pretty quiet couple of days. We've been told that on Monday they will
start taking off the roof over the living room and I think things will be pretty busy from then
on. Today Chip was out putting stakes down where the posts will be for the patio. He then
surrounded them with charcoal and burned it for a while.
Pictures - Wednesday, Jan 16
January 15, 2008 - Day 7
Not much today. Chip covered the floor area and marked the area where the deck posts
will be.
Pictures - Tuesday, Jan 15
January 14, 2008 - Day 6
Today the excavator was back. They backfilled all the dirt. Our friends Heather,
Logan and Brayden were over to see the excitement. The backyard looks kind of normal again
Pictures - Monday, Jan 14
January 11, 2008 - Day 5
Not much activity today - just a little insulation added to the footings.
Pictures - Friday, Jan 11
January 10, 2008 - Day 4
Today they put the block footings in (I think that's what they're called).
The big news is that there was a measurment incorrect in our original house plans.
Because of that the new wall would go right through our sliding door. Our contractor
is taking care of fixing the problem and we will be getting a new door because
of it. It actually will work out pretty nice because now we won't have to reuse
our old sliding door to get into the screened in porch. So I guess it all
worked out.
Pictures - Thursday, Jan 10
January 9, 2008 - Day 3
After no activity yesterday, they were busy today. Bailey and Ben were over so the kids
had lots of fun watching them work! They got to see the excavator dig out more
dirt and then the cement mixer came in the afternoon.
Pictures - Wednesday, Jan 9
Kids watching.
Kids playing some music for the workers.
January 7, 2008 - Day 1
They arrived this morning just before 8:30. The kids and parents walking to the school bus got to
see our excavator arrive and start working. They marked the spot and started digging up dirt. The kids
have had a lot of fun watching.
Pictures - Monday, Jan 7
Adam and Emily watching the excavator.
January 2, 2008
Pre-construction walk-thru occurred this morning. Andy, Bill and Chip arrived to do the walk-thru
We have been working with Andy so far in the design process. Things went very well. They had
lots to discuss and things seemed to go smoothly. We had a few questions that got answered as well.
Andy will get us the updated plans soon and we should get a schedule in the next week. They are set
to start the excavation on Monday. They will probably be around this weekend to take down our deck.
December 2007
Here are pictures and video of our house before beginning.
Photos:
Exterior house pictures
Interior house pictures
Videos:
Front and side of house
Back of house
Adam and Emily pushing the wall out
Introduction
We have been thinking about a home remodel for awhile, but have been unsure of exactly when
it would happen. This summer we really started talking about the possibility of spring 2008.
In October we went to the Remodeler's Showcase as well as Parade of Homes and seriously considered
the pro's and con's of buying vs. remodeling. We chose to remodel our current home. There
are many things we love about our home and our location and we don't want to move.
In November we began interviewing builders and chose Brunn Remodeling to do our project. Our original
plans included an added sunroom and basement addition (a two story add-on to our existing living room).
We also talked about the possibility of adding another bedroom upstairs. After a couple different
considerations, we are basically transforming our modified two story into a full two story
and are adding another bedroom, a loft area and a new walk in closet for our master bedroom.
This webpage will show the progress that is made for those that are interested in following us
on this journey.
|
|
|